Garden office, cabin or a first home.
Moddiz designs and manufactures prefabricated building modules — homes, offices and commercial spaces assembled on site in days, not months. Start with one module and add more whenever you need them.
per module
from design to keys
built in the factory, not on site
modules in one building
Every Moddiz building is made of the same base module. Modules join side by side and stack on top of each other — a home, an office or a guesthouse are simply different arrangements of the same parts.
width × length × height, fits a standard truck
of the work happens indoors — no weather, full quality control
Strong, light and precise to the millimetre.
Electrics, water and ventilation are fitted at the factory. On site, modules simply connect.
Modules stack without any extra load-bearing structure.
The building grows with you. Modules can be added later, moved to another plot or resold.
Thick insulation, triple glazing and a heat pump as standard. Energy class A0.
Four proven layouts as a starting point. Change any of them, extend it, or design your own from scratch.
Garden office, cabin or a first home.
Compact living for two or a rental apartment.
Two-storey family home with a roof terrace.
Offices, a clinic or a showroom — ready to grow.
Tap a plan cell to add a module. Tap again to add a floor, a third time to remove it.
Indicative figures for planning. We prepare an exact quote for your plot.
Send this layout for a quoteWhile the foundations are prepared on your plot, the modules are built in parallel at the factory. That is why the building is finished months earlier.
Layout, floor plan and finishes. 3D visualisation and a fixed price.
Week 1–2
Modules are built indoors, including services, windows and finishes.
Week 3–7
Finished modules arrive by truck and a crane sets them on the foundations.
1 day
Connecting modules and utilities, inspection and handover of the keys.
2–3 days
From a tiny house to a family villa that can grow over time.
Glamping, apartments and cabins — a fast return on investment.
Headquarters and workspaces that add modules as the team grows.
Identical rooms made in series — the same quality in every one.
Classrooms, nurseries and clinics built during the holidays.
Site offices and event facilities — afterwards the modules move on.
Typically 8 weeks from the approved design to handing over the keys. Assembly on the plot itself takes only a few days.
It depends on the size of the building and local regulations. We help with the documentation and the whole permit process.
Yes — that is the whole point of the system. Simply plan for the future extension at the design stage.
Modules with services, windows and finishes, transport, placement and connection. Foundations and utility connections by agreement.
Across Europe. Modules are sized to travel by standard road transport.